dda approvals Dubai

DDA Approvals in Dubai

Dubai is a city of dreams. It gives wings to your ideas and helps you propel forward. You can see a lot of architectural marvels and innovative construction projects here. Being a part of the growth of Dubai can drive your growth trajectory to the next level. But for this to happen, you will need to understand and obtain Dubai Development Authority (DDA) approval. So, let’s understand DDA and why it’s crucial to obtain DDA approvals to embark on your dream venture.

DDA: What is Dubai Development Authority or DDA?

The meaning of DDA can be confusing for you. DDA Dubai, also previously known as DCCA (Dubai Creative Cluster Authority), is the major regulatory authority for development in Dubai. DDA was established in 2007 by His Highness Sheikh Mohammed bin Rashid Al Maktoum. It ensures that all development in Dubai happens in line with the overall strategic vision.

The DDA’s key tasks include regulating and approving all construction activity, issuing permits for excavations, land reclamation, and demolition works, as well as ensuring compliance with the Emirate’s environmental protection laws. The office of DDA is located at Dubai Studio City Commercial Office 1,Ground Floor, Dubai.

For any construction project in Dubai, a DDA approval certificate needs to be displayed. A DDA Approval Certificate is issued to developers once they submit the required documentation to the DDA. Upon approval, the developer will be issued a certificate that needs to be displayed at the project site.

What is DDA Approval and Why it's needed?

Dubai Development Authority (DDA) approval is a regulatory certification required for construction, modifications, and business operations in specific zones in Dubai, such as Media City, Internet City, and Dubai Design District. The DDA, formerly known as the Dubai Creative Cluster Authority, regulates building permits, zoning, and compliance with Dubai’s strategic development plan.

Most areas in Dubai come under the Dubai Development Authority (DDA), such as Palm Jumeirah, Dubai Industrial City, Barsha Heights, Falcon City of Wonders, DAMAC Hills, and Motor City Dubai. DDA looks after many specific zones in Dubai including Media City, Internet City, Studio City, TECOM, Dubai Design District (D3), and Dubai Production City (IMPZ).

To start a new business or modify the existing business in these areas, such as a cafeteria, clinic fit-out, or office partition, DDA approval is mandatory. Industries and business parks in these clusters actively collaborate and interact, adhering to DDA-approved standards and regulations, particularly in construction and development.

Each cluster under DDA Dubai’s jurisdiction ensures compliance with these guidelines to maintain smooth business operations. This strict enforcement fosters a professional environment, enabling ventures to collaborate effectively with leading global organizations

DDA Approvals in Dubai

DDA Approval Process-Key Steps

DDA Approval Steps in Dubai

Step 1: Gather Required Documentation

Before initiating the DDA approval process, it is essential to prepare the necessary documentation. The following documents are typically required:

1.    Completed application form

2.    Trade license or non-occupancy letter

3.    Ejari (tenancy contract)

4.    No Objection Certificate (NOC) from the landlord or property management

5.    Contractor appointment letter

6.    Title deed or lease agreement

7.    Architectural and engineering drawings

8.    Approved documents from the Dubai Civil Defence (DCD) and DDA

Step 2: Submit the Application

Applications can be submitted via two main channels:

1.    Online: You can use the DDA’s online portal to submit your application, and then track the approval status.

2.    In-Person: Alternatively, you can visit the DDA customer service center to submit documents directly. This method may enable you to communicate immediately with DDA representatives.

Step 3: Await Feedback

Once the application is submitted, the DDA will review and provide feedback within the estimated processing times. In case of any issues in the documents, you will need to revise the submission or provide additional documents as requested.

Step 4: Final Inspection and Approval

After completing of the Fit-Out or building modification, a final inspection will be conducted by DDA representatives. This inspection is to ensure that the work is compliant with the approved designs and local regulations. Upon successful completion, a completion certificate is issued, allowing you to commence operations.

 

DDA Approved Contractor


The whole process of approvals can be confusing and time-consuming. Hence, DDA has a list of DDA-approved contractors who can make your life easier. These contractors are duly certified and will help in all stages of DDA approval.

DDA Certified Contractor Requirements:

  • Pre-Qualification certificates from Dubai Municipality (showing approved contractor)
  • Valid trade license
  • Deposit
  • Letter of undertaking

Taslleeh is a registered contractor with Dubai Development Authority and is licensed to practice as consultant and contractor in Dubai. You can WhatsApp us at +97143344875 or call us at 80034774 (toll-free)

Final Master Plan

The Final Master Plan is a comprehensive report providing an overall strategy to develop a particular project/area. It includes all of the previous stages and provides final findings in addition to Plot Development Guidelines. This document is represented in the form of a template that is signed by the Master Developer, Consultant, and Dubai Development Authority.

Required Documents:

  • Master Planning Approval Request to be submitted by a registered Consultant
  • Final Master Plan as per Master Planning Guidelines in PBF
  • NOCs from relevant Authorities
  • Final Master Plan Review Checklist
  • Building Footprint Layout (CAD and Excel)

    FAQs-DDA Approval

    How much is the DDA approval fee or building permit?

    The DDA approval fee is AED 1.00 per sq ft on Total Built-Up-Area (minimum AED 200). The final building permit fees
    will be determined after deducting the fees which were paid previously for the Interim & Preliminary Permits.

     

    Do you provide DDA (Dubai Development Authority) approval?

    Yes, we provide all types of DDA approvals, including restaurants, offices, villas, and more.

     

    What documents are required for DDA Approval?

    • Completed application form
    • Trade license or non-occupancy letter
    • Ejari (tenancy contract)
    • No Objection Certificate (NOC) from the landlord or property management
    • Contractor appointment letter
    • Title deed or lease agreement
    • Architectural and engineering drawings
    • DDA Approved documents

    What is the fee structure for DDA Approval?

    The fee structure of DDA can vary as per your requirements. The authorities have different rates which can vary mainly depending on the area of the business you want to set up or modify.

     

    How do we get DDA (Dubai Development Authority) approval easily with Taslleeh?

    Provided we submit all drawings in the proper format as per DDA guidelines, we can get approvals faster. Our engineers have the expertise and will help you get the approval quickly to start your business in Dubai. We connect with DDA to obtain zoning approvals for master planning and building services on your behalf. The UAE government is very supportive of the private sector and has created an organized system for managing it. We actively apply for building permit procedures of every kind on your behalf whenever you require them, depending on the respective government regulations. Our familiarity with the rules ensures faster zoning approvals for construction and development within the thriving city of Dubai. To eliminate any risk of rejection, the experts at Taslleeh will study the particular requirements of your DDA approval beforehand. Commonly, clients approach us for fit-out permits as well as building permit procedures in Dubai for modification and design. We understand that there will be frequent adjustments made during construction due to unforeseen circumstances, so Taslleeh makes it easy for you to accommodate them in a timely fashion.

     

    Which are the Zones covered by DDA?

    1.    Al mamzar front

    2.    Shamal plots (mamzar)

    3.    Shamal plots (nahda)

    4.    Shamal plots (muhaisna second)

    5.    Al qusais residence

    6.    Zayed bin mohammed family gathering

    7.    Al khawaneej district

    8.    Meraas plots at mirdif

    9.    Ghoroob

    10. Shorooq

    11. Meraas plots at al warqa’a third

    12. Dubai creek harbour

    13. Towerside

    14. Dubai healthcare city phase 1

    15. Dubai healthcare city phase 2

    16. Jaddaf waterfront

    17. Culture village phase 1, 2, 3

    18. Warsan first development

    19. Al warsan fourth

    20. Green community

    21. The lagoons

    22. Umm hurair

    23. Dubai industrial city

    24. Damac hills

    25. Damac hills 2

    26. Akoya oxygen

    27. Media production city

    28. Al barsha first

    29. Al barsha second

    30. Al barsha south second

    31. Al barsha south third

    32. Al barsha south fourth

    33. Dubai sports city

    34. Tecom

    35. Al thanya first

     

    Why Choose Us

    Experience

    Over 4 years of Experience in dealing with thousands of approvals

    Customer Testimonials

    Over 175+ reviews on google

    Dedicated Team

    Team of Engineers and estimators to speed up approvals

    Complete Engineering Solutions

    Completely Inhouse operations

    DDA Building Modification Work Permits

    If you are looking for Building Modification Permits and fastest DDA Approvals in Dubai, We are the best choice

    Our Scope includes:

    • Design and preparation of technical drawings.
    • Preparation and collection of all related and required documents.
    • Submission of drawing and documents through proper channels / portals.
    • Follow up with the related to get the approvals / work permits.
    • Attending site visits and meetings.
    • Acquiring approvals / work permit.